TRAINING PROJECT RISK MANAGEMENT WITH MONTECARLO SIMULATION

Jakarta Project Management

TRAINING PROJECT RISK MANAGEMENT WITH MONTECARLO SIMULATION

TRAINING PENGELOLAAN RISIKO PROYEK DENGAN SIMULASI MONTE CARLO

TRAINING MONTE CARLO INTRODUCING

pelatihan PROJECT RISK MANAGEMENT WITH MONTECARLO SIMULATION di jakarta

Background

Simulation often leads to a better understanding of the real system. Years of experience in the real system can be compressed into seconds or minutes. Simulation does not disrupt ongoing activities of the real system. Simulation can be used when data is hard to come by. Simulation can provide a more realistic replication of a system than mathematical analysis.

Simulation can be used to analyze transient conditions, whereas mathematical techniques usually cannot. Simulation considers variation and can calculate confidence intervals of model results.

Simulation can model a system with multiple phases. Simulation can model a system when it is already in a steady-state (i.e., can initialize the system with the beginning queue, beginning inventory, etc.!). Simulation can also test a “range” of inputs to perform what-if/sensitivity analysis

Benefits

  • Understand how to simulate model
  • Understand how to use software

Key Topics

  1. Simple Statistic and Probability
    • Probability
    • Descriptif and inferensial statistics with Excel
    • Statistics distribution with Excel
  2. Monte Carlo Introducing
    • what is Simulation
    • what is Monte Carlo Simulation
    • Advantage of Monte Carlo
  3. Carlo Simulation and Crystal Ball Software
    • simulation without Monte Carlo
    • Cost and scheduling
  4. Cases using Monte Carlo Simulation
    • Risk analysis with EVM
    • PERT

Mode Delivery

  •  Lecture,
  • Discussion, and
  • Practice with software

Participants

  • Risk analysis/head of project/owner of project (project management)
  • Financial analysis (finance)
  • Marketing research
  • Operating management (industrical products)
  • etc who face with uncertenty

INSTRUKTUR

Instruktur yang mengajar pelatihan  PROJECT RISK MANAGEMENT WITH MONTECARLO SIMULATION ini adalah instruktur yang berkompeten di bidang  PROJECT RISK MANAGEMENT WITH MONTECARLO SIMULATION baik dari kalangan akademisi maupun praktisi.

Jadwal pelatihan hukumsdm 2025 :

  • Batch 1 : 30 – 31 Januari 2025
  • Batch 2 : 13 – 14 Februari 2025
  • Batch 3 : 11 – 12 Maret 2025
  • Batch 4 : 16 – 17 April 2025
  • Batch 5 : 15 – 16 Mei 2025
  • Batch 6 : 25 – 26 Juni 2025
  • Batch 7 : 16 – 17 Juli 2025
  • Batch 8 : 6 – 7 Agustus 2025
  • Batch 9 : 3 – 4 September 2025
  • Batch 10 : 8 – 9 Oktober 2025 || 29 – 30 Oktober 2025
  • Batch 11 : 13 – 14 November 2025 || 25 – 27 November 2025
  • Batch 12 : 15 – 16 Desember 2025

Catatan : Jadwal tersebut dapat disesuaikan dengan kebutuhan calon peserta training Monte Carlo Simulation and Crystal Ball Software pasti jalan

Invetasi dan Lokasi pelatihan Monte Carlo Introducing di jakarta :

· Yogyakarta, Hotel 101

· Jakarta, Hotel Amaris Kemang

· Bandung, Hotel Neo Dipatiukur

· Bali, Hotel Ibis Kuta

· Surabaya, Hotel Amaris, Ibis Style

· Lombok, Sentosa Resort

Catatan : Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan.

Fasilitas  pelatihan Monte Carlo Simulation and Crystal Ball Software di jakarta :

· FREE Airport pickup service (Gratis Antar jemput Hotel/Bandara/Stasiun/Terminal)

· FREE Akomodasi ke tempat pelatihan bagi peserta training Monte Carlo Introducing jakarta pasti running

· Module / Handout training PENGELOLAAN RISIKO PROYEK DENGAN SIMULASI MONTE CARLO jakarta fixed running

· FREE Flashdisk

· Sertifikat training PROJECT RISK MANAGEMENT WITH MONTECARLO SIMULATION di jakarta murah

· FREE Bag or bagpackers (Tas Training)

· Training Kit (Dokumentasi photo, Blocknote, ATK, etc)

· 2xCoffe Break & 1 Lunch, Dinner

· FREE Souvenir Exclusive

· Training room full AC and Multimedia

.